Flood protection in 1 minute?

Get rid of the old sandbags!!!

We can dilliver, install over 100 meter TubeBarrier of 70 cm high in less than 1 hour.

 

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *